ICR
Validated

Balsuyu Rooftop Solar project

Balsuyu Rooftop Bundled Solar Power Plants

Please fill out the form to get in touch with the project developers.

Project Information

Est. Annual Mitigations

5,447t CO2-e

Project Status
Validated
Project Type
Avoidance / Reduction
Sector
Energy industries
Methodology
AMS-I.D.
Project Description

Balsuyu Bundled Rooftop Solar Power Plants is a small-scale Greenfield renewable solar power plant, located in Kahramanmaraş, Türkiye. The purpose of the project is to provide renewable electricity to the national grid through harnessing solar energy. Starting operation on 10/12/2020, the project provides 8,400.0 MWh/year electricity to the national grid, achieving 5,447 tCO2 of emission reductions annually.

Validation Criteria
ISO 14064-2:2019
Applied methodology
ICR requirements v5.0
Verification Body

Verification Criteria
ISO 14064-2:2019
Applied methodology
Project design description
ICR requirements v5.0

Media

Location

Country
Turkey
City
Kahramanmaraş
Address
Balsuyu Bulvarı/ 280 Ada/3 Parsel and 537 Ada/19 Parsel Türkoğlu
Geographical Region
Europe
Coordinates
37.4201149, 36.8845048
View on Map
Credits
All credit information, issuances, retirements and holders.
Est. Annual Mitigations
5K
t CO2-e per year
Est. Total
54K
t CO2-e
Crediting Start Date
OCT 12 '20
Crediting Period
10 Years

Sustainable Developement Goals

Affordable and Clean Energy

Ensure access to affordable, reliable, sustainable and modern energy for all

Decent Work and Economic Growth

Promote sustained, inclusive and sustainable economic growth, full and productive employment and decent work for all

Climate Action

Take urgent action to combat climate change and its impacts

Additionality

Level 1 additionality

Baseline additionality. Compared to the baseline scenario the project needs to mitigate climate change. That is the project must implement actions that are additional to what would occur compared to the baseline.

Level 2a additionality

Statutory additionality. The project must implement actions that are beyond requirements stipulated in local legislation or regulations. Projects are statutory additional if their implementation and/or operation is not required by any law, statute, or other regulatory framework, agreements, settlements, or other legally binding mandates requiring implementation and operation or requiring implementation of similar measures that would result in the same mitigations in the host country.

Level 4a additionality

Financial additionality I. A project is financially additional if it results in higher costs or relatively lower profitability than would have otherwise occurred in the baseline scenario.

Level 5 additionality

Policy additionality. Implementation of actions may lie out of the scope of the host country's Nationally Determined Contributions under the Paris Agreement and, therefore, not eligible for international transfer mechanism. When project implementation goes beyond its host country’s climate objectives and lies outside of the scope of its climate action strategy towards its NDCs, it is considered to be policy additional.

Project Insights

People

An overview of all the people associated to this project. Participants, validators, verification bodies and other.

Contact persons

Documents
An overview of all documents connected to this project
Version
File size
Kml file

1 documents

No issuance statement

1 documents

Other note

1 documents

Project description

1 documents

Review report

1 documents

Validation report

1 documents

Rows per page

Page 1 of 1