ICR
Under validation

KEAS Solar Roof Bundle

KEAS Solar Roof Bundle

Please fill out the form to get in touch with the project developers.

Project Information

Est. Annual Mitigations

19,469t CO2-e

Project Status
Under validation
Project Type
Avoidance / Reduction
Sector
Energy industries
Methodology
ACM0002
Project Description

KEAS Roof Solar Power Bundle Project is a greenfield solar power plant project, owned by Kastamonu Entegre Ağaç San. Ve Tic. A.Ş. The project activity as a whole has a total installed capacity of 24.5559 MWm, 20.100 MWe with an average annual electricity generation of 30,686.879 MWh. The expected annual average GHG emission reductions are 19,469 tCO2e/yr (Rounded Down), that will contribute to the alleviation of climate change effects.

Validation Body

Validation Criteria
ISO 14064-2:2019
ICR requirements v5.0
Applied methodology
Verification Body

Verification Criteria

Media

Location

Country
Turkey
City
Kastamonu
Address
7. Cadde
Geographical Region
Asia
Coordinates
N/A
Credits
All credit information, issuances, retirements and holders.
Est. Annual Mitigations
19K
t CO2-e per year
Est. Total
195K
t CO2-e
Crediting Start Date
JAN 26 '24
Crediting Period
10 Years

Sustainable Developement Goals

Affordable and Clean Energy

Ensure access to affordable, reliable, sustainable and modern energy for all

Decent Work and Economic Growth

Promote sustained, inclusive and sustainable economic growth, full and productive employment and decent work for all

Climate Action

Take urgent action to combat climate change and its impacts

Additionality

Level 1 additionality

Baseline additionality. Compared to the baseline scenario the project needs to mitigate climate change. That is the project must implement actions that are additional to what would occur compared to the baseline.

Level 2a additionality

Statutory additionality. The project must implement actions that are beyond requirements stipulated in local legislation or regulations. Projects are statutory additional if their implementation and/or operation is not required by any law, statute, or other regulatory framework, agreements, settlements, or other legally binding mandates requiring implementation and operation or requiring implementation of similar measures that would result in the same mitigations in the host country.

Level 3 additionality

Technology, institutional, common practice additionality. The project must implement actions that are subject to barriers of implementation or accelerate deployment of technology or activities and carbon market incentives are essential in overcoming these barriers.

Level 4a additionality

Financial additionality I. A project is financially additional if it results in higher costs or relatively lower profitability than would have otherwise occurred in the baseline scenario.

Project Insights

People

An overview of all the people associated to this project. Participants, validators, verification bodies and other.

Contact persons

Documents
An overview of all documents connected to this project
Version
File size
Kml file

1 documents

Other note

2 documents

Project description

2 documents