LFG management project for 2nd phase of Liulitun landfill in Haidian District
Please fill out the form to get in touch with the project developers.
Project Information
133,481t CO2-e
The LFG management project for second phase of Liulitun landfill in Haidian District is invested and owned by Beijing Huatairunda Energy Saving Technology Co.Ltd. The project captures the landfill gas that would have been released to the atmosphere in the absence of the project and generates electricity with the landfill gas (LFG). Emission reductions by the project would be claimed from the methane destruction by gas engines through LFG consumption and electricity replacement by 10MW (5X2MW) internal combustion engine generators through electricity generation. The largest power generation would be 72,000MWh and of which 64,800MWh would be supplied to the North China Power Grid. It is estimated that annual average 152,550 tCO2e emissions and totally 1,067,851 tCO2e emissions could be reduced in the first 7-year crediting period. Project 9413 - Transitioned from CDM.
Media
Sustainable Developement Goals
Additionality
People
An overview of all the people associated to this project. Participants, validators, verification bodies and other.
Contact persons
Version | File size | ||||
---|---|---|---|---|---|
Project description 1 documents | |||||
Validation report 1 documents |