LFG management project for 2nd phase of Liulitun landfill in Haidian District

Please fill out the form to get in touch with the project developers.

Project Information

Est. annual mitigations

133,481t CO2-e

Project Status
Under development
Project Type
Avoidance / Reduction
Sector
Waste handling and disposal
Methodology
ACM0001
Project Description

The LFG management project for second phase of Liulitun landfill in Haidian District is invested and owned by Beijing Huatairunda Energy Saving Technology Co.Ltd. The project captures the landfill gas that would have been released to the atmosphere in the absence of the project and generates electricity with the landfill gas (LFG). Emission reductions by the project would be claimed from the methane destruction by gas engines through LFG consumption and electricity replacement by 10MW (5X2MW) internal combustion engine generators through electricity generation. The largest power generation would be 72,000MWh and of which 64,800MWh would be supplied to the North China Power Grid. It is estimated that annual average 152,550 tCO2e emissions and totally 1,067,851 tCO2e emissions could be reduced in the first 7-year crediting period. Project 9413 - Transitioned from CDM.

Validation Body

Validation Criteria
ICR requirements v3.0
Applied methodology
Verification Body

Verification Criteria
ICR requirements v3.0
Project design description
Applied methodology

Media

Location

Country
China
City
Beijing
Address
No 1, Building Guanaoyuan, Baoshengli, Haidian District
Geographical Region
Asia
Coordinates
39.95185445, 116.4561216360817
View on Map

Sustainable Developement Goals

Additionality

Project Insights

People

An overview of all the people associated to this project. Participants, validators, verification bodies and other.

Documents
An overview of all documents connected to this project
Version
File size
Project description

1 documents

Validation report

1 documents