Prymorska Wind Farm 2
Prymorska Wind Farm 2
Please fill out the form to get in touch with the project developers.
Project Information
205,975t CO2-e
Prymorska Wind Farm 2 (WF-2) is a renewable type of wind power plant with an operation start date of 01/09/2019, located in Zaporizhzhia region in Ukraine. The purpose of the project is to provide renewable electricity to the Ukraine grid through harnessing wind energy. Prymorska WF-2 is a large-scale project activity with an installed capacity of 99.58 MW, providing 320,335.65 MWh/year clean electricity to the Ukraine grid system, and achieving 205,975 tCO2 of emission reduction annually.
Media

Sustainable Developement Goals

Affordable and Clean Energy
Ensure access to affordable, reliable, sustainable and modern energy for all

Decent Work and Economic Growth
Promote sustained, inclusive and sustainable economic growth, full and productive employment and decent work for all

Climate Action
Take urgent action to combat climate change and its impacts
Additionality
Level 1 additionality
Baseline additionality. Compared to the baseline scenario the project needs to mitigate climate change. That is the project must implement actions that are additional to what would occur compared to the baseline.
Level 2a additionality
Statutory additionality. The project must implement actions that are beyond requirements stipulated in local legislation or regulations. Projects are statutory additional if their implementation and/or operation is not required by any law, statute, or other regulatory framework, agreements, settlements, or other legally binding mandates requiring implementation and operation or requiring implementation of similar measures that would result in the same mitigations in the host country.
Level 3 additionality
Technology, institutional, common practice additionality. The project must implement actions that are subject to barriers of implementation or accelerate deployment of technology or activities and carbon market incentives are essential in overcoming these barriers.
Participants
Organizations involved in the project
Version | File size | ||||
---|---|---|---|---|---|
No issuance statement 1 documents | |||||
Other note 4 documents | |||||
Project design description and monitoring report 3 documents | |||||
Review report 2 documents | |||||
Validation and Verification Plan 1 documents | |||||
Validation and verification report 1 documents |
Rows per page