Shaoguan City Shaoneng Biomass Power Generation Project
Please fill out the form to get in touch with the project developers.
Project Information
Est. annual mitigations
166,388t CO2-e
Project Status
Under development
Project Owner
Project Type
Avoidance / Reduction
Sector
Energy industries
Methodology
ACM0018
Project Description
The Project is a greenfield project with a total installed capacity of 60MW consisting of 2×30 MW units. The annual biomass residue consumption of the Project is 306,600 tonnes, expected annual operating hours is 6,000 hours per annum with resulting expected annual electricity generation of 360,000 MWh per annum. The plant load factor(PLF) equals to 68.49%. Of this generation figure, 318,600 MWh is expected to be delivered net of auxiliary power use to the Guangdong power grid, part of the China Southern Power Grid (CSPG).
Media
Sustainable Developement Goals
Additionality
People
An overview of all the people associated to this project. Participants, validators, verification bodies and other.
Contact persons
Documents
An overview of all documents connected to this project
Version | File size | ||||
---|---|---|---|---|---|
Project description 1 documents | |||||
Validation report 1 documents |