Shaoguan City Shaoneng Biomass Power Generation Project

Please fill out the form to get in touch with the project developers.

Project Information

Est. annual mitigations

166,388t CO2-e

Project Status
Under development
Project Type
Avoidance / Reduction
Sector
Energy industries
Methodology
ACM0018
Project Description

The Project is a greenfield project with a total installed capacity of 60MW consisting of 2×30 MW units. The annual biomass residue consumption of the Project is 306,600 tonnes, expected annual operating hours is 6,000 hours per annum with resulting expected annual electricity generation of 360,000 MWh per annum. The plant load factor(PLF) equals to 68.49%. Of this generation figure, 318,600 MWh is expected to be delivered net of auxiliary power use to the Guangdong power grid, part of the China Southern Power Grid (CSPG).

Validation Body

Validation Criteria
ISO 14064-2:2019
ICR requirements v3.0
Applied methodology
Validation Body

Validation Criteria
ISO 14064-2:2019
ICR requirements v3.0
Applied methodology
Project design description

Media

Location

Country
China
City
Shaoguan City
Address
Xiaba Village, Leyuan Town, Zhenjiang District
Geographical Region
Asia
Coordinates
24.8011093, 113.6112315
View on Map

Sustainable Developement Goals

Additionality

Project Insights

People

An overview of all the people associated to this project. Participants, validators, verification bodies and other.

Documents
An overview of all documents connected to this project
Version
File size
Project description

1 documents

Validation report

1 documents